Ceramisite Shale New Type Building Material
1. Undertaking Unit:

Business Management Committee of Caoyuan Town of Yong'an City

2. Site of Project: Caoyuan Town of Yong'an City
3. Person in Charge:
    Contact Tel:
Liu Kailin
0598-3570128
4. Reasons & Conditions for Its Construction an Market Forecasting:
   Ceramisite shale is a new type of building materials. With the advantage of light weigh and high strength and such excellent properties as noise-absorbing thermal retardation, heat insulation, water resistance, fire-resisting, resistance tochemical and bacteria corrosion, frost-resistance and quake-proof, it is very suitable for high building construction. Ceramisite can be used as skeletal material (being a substitute for sand) of the high building construction concrete. It is also a good kind of materials for pipe insulation, furnace shaft insulation and sound isolation. If we use Ceramisite to replace the stone material as the filling material for the concrete, we'll reduce the weight of the building by 30-35 %, the steel used by 10%, and raise the property of quake-proof of the building. Ceramisite can also be used to make heat insulation concrete fire retardanttiles and so on. It has a broad use in architecture, chemistry, metallurgy, agriculture, gardening etc.
   Shale ceramisite's production cost is just 20-30 yuan per cube meter while its market price is 40-60 yuan per cube meter. It has considerable production profit and broad market prospects.
5. Construction Scale and Main Contents:
   Achieve an annual output of 500,000 cube meters.
6. Total Input and Utilization of Foreign Fund:
   Total input: 10,000,000 yuan, planned foreign investment: 1,000,000 dollars
7. Form of Using Foreign Investment:
   Sole investor, joint venture, or cooperation.
8. Analysis on the Economic Results:
   After the completion and commissioning of the project, the annual selling income can reach 20,000,000 to 30,000,000 yuan; tax income: 3,200,000 yuan; profit: 2,200,000 yuan; rate of return and investment: 22%; payback period for the investment: 4.5 years.
9. The Development of the Preliminary Work:
   The completion of the project feasibility study.